Quotes

Information on what is included in our quotations


If you request a quote from us we will generally include everything you need in our quotation:

  • All materials
  • Labour for all trades including electricians and gas engineer/plumber
  • Scaffold
  • Waste removal

If you are getting quotes from multiple builders (which is good practice), when you evaluate them ask if everything is included as above as some builders will reduce costs by not including things like skips or electrical work.

We do not normally include a cost for supply of kitchen units and worktops as there is such a wide choice, however we can assist you with choosing a kitchen and of course installation as well.

We never ask for money up front and always sign up to a payment plan with our clients, an example of which is below. This ensure that you are only paying for work that you can see has been completed and therefore you cannot lose money paying for things that never turn up!

  • 1.
  • Groundwork to foundations poured
  • 15%
  • 2.
  • Masonry to damp-proof course level and subfloor complete
  • 25%
  • 3.
  • Masonry to wall plate level
  • 35%
  • 4.
  • Roof structure complete
  • 40%
  • 5.
  • Roof covering complete
  • 50%
  • 6.
  • External doors and windows fitted
  • 55%
  • 7.
  • First fix complete all trades
  • 65%
  • 8.
  • Plastering complete
  • 80%
  • 9.
  • Second fix complete all trades
  • 95%
  • 10.
  • Handover
  • 100%